Box 2428
Container
Contains 44 Results:
Indiana University, 1961
File — Box: 2428, Folder: 41
Scope and Contents
From the Record Group:
The early records document the major projects taken on by the Institute of Biology and Medicine in fulfilling its objectives. Those were the establishment of the College of Human Medicine, the construction of the Life Science Building I, the construction of the Encapsulated Health Care Facility (a project which failed after considerable effort), the construction of the Clinical Sciences building, and the establishment of the College of Osteopathic Medicine. The material is best described as...
Dates:
1961
Temple University, October-December 1968
File — Box: 2428, Folder: 42
Scope and Contents
From the Record Group:
The early records document the major projects taken on by the Institute of Biology and Medicine in fulfilling its objectives. Those were the establishment of the College of Human Medicine, the construction of the Life Science Building I, the construction of the Encapsulated Health Care Facility (a project which failed after considerable effort), the construction of the Clinical Sciences building, and the establishment of the College of Osteopathic Medicine. The material is best described as...
Dates:
October-December 1968
Tufts – New England Medical Center, 1964 - 1965
File — Box: 2428, Folder: 43
Scope and Contents
From the Record Group:
The early records document the major projects taken on by the Institute of Biology and Medicine in fulfilling its objectives. Those were the establishment of the College of Human Medicine, the construction of the Life Science Building I, the construction of the Encapsulated Health Care Facility (a project which failed after considerable effort), the construction of the Clinical Sciences building, and the establishment of the College of Osteopathic Medicine. The material is best described as...
Dates:
1964 - 1965
University of Florida, 1960
File — Box: 2428, Folder: 44
Scope and Contents
From the Record Group:
The early records document the major projects taken on by the Institute of Biology and Medicine in fulfilling its objectives. Those were the establishment of the College of Human Medicine, the construction of the Life Science Building I, the construction of the Encapsulated Health Care Facility (a project which failed after considerable effort), the construction of the Clinical Sciences building, and the establishment of the College of Osteopathic Medicine. The material is best described as...
Dates:
1960